2025-02-09 00:46 |
admin |
Info |
February 2025
- License coordination completed without a problem.
- FCC paperwork submitted.
|
Toggle Dropdown |
2025-02-09 00:45 |
admin |
Info |
January 2025
- Initiated the process of licensing a 11GHz microwave PtP link between Hurricane and City Hall. Licensing is being coordinated by Liz @ IntelPath and will cost ~$1K
|
Toggle Dropdown |
2025-02-09 00:37 |
admin |
Info |
January 2025
- Validated a link between Hurricane and City Hall using an pair of AREDN nodes.
- Originally reported that the current mounting frame on the roof will need to be moved a few feet for ideal placement of the new link. However, later inspection of the photos take on site suggest I may have aligned my test link on the wrong distant object. This was only a difference of 1 degree (so the test was valid) but might be enough to avoid moving anything.
|
Toggle Dropdown |
2024-12-07 21:55 |
admin |
Info |
April 2024
- Re-adjust antenna once Mount Allison dish is installed.
- Replace missing radio bolt.
|
Toggle Dropdown |
2024-12-07 21:55 |
admin |
Info |
March 2024 / 2
- Adjust dish positioning to improve SNR.
|
Toggle Dropdown |
2024-12-07 21:55 |
admin |
Info |
March 2024 / 1
- Replace Mimosa power solution with injector + power controller (ezOutlet5)
- The B11 radio required more power (just occasionally) than the router could provide, causing resets.
|
Toggle Dropdown |
2024-12-07 21:54 |
admin |
Info |
February 2024
- Adjusted and raised dish to try to get connection to Fire Station 8, but failed. Looks like the landfill is just too high now.
- Repointed dish at Mount Allison for alternate path.
- Observer 10GHz beacon at Mt Allison on radio's spectrum analyzer
|
Toggle Dropdown |
2024-12-07 21:53 |
admin |
Info |
January 2024 / 3
- Added 10 GHz Mimosa dish on roof, pointing at Fire Station 8
- Connection could not be made. The other end is not yet aligned. It's also possible the link is non-viable as the "tip" near the Bay may be too high now and obstructing.
|
Toggle Dropdown |
2024-12-07 21:53 |
admin |
Info |
January 2024 / 2
- Installed KVM
- Labelled newly installed cables
- Terminated and installed roof ethernet
- Cable has been pulled to the roof by HE.
|
Toggle Dropdown |
2024-12-07 21:52 |
admin |
Info |
January 2024 / 1
- Installed 1G and 10G optics for later use
|
Toggle Dropdown |
2024-12-07 21:52 |
admin |
Info |
December 2023 / 3
- Setup peering with ARIX on 1G optics
|
Toggle Dropdown |
2024-12-07 21:51 |
admin |
Info |
December 2023 / 2
- Installed new PDU
- Removed Media Converter
- Installed Mikrotik CRS309-1G-8S+IN Switch to support multiple incoming fibers
- Configured BGP
- Configured OSPF
- Configured Wireguard to Oxford as temporary link until dish installed
- Switched FCIX optics to 10G
- Installed HE fiber in 1G optics on switch
|
Toggle Dropdown |
2024-12-07 21:51 |
admin |
Info |
December 2023 / 1
- Installed Router
- Installed Proxmox Server
- Installed SFP Media Converter
- Attached HE fiber to Router
|
Toggle Dropdown |