November 2025: Initial Install
- Installed 3 sectors (2 currently operational).
- Installed wireless-wire connecting tower to Stanford Club building.
- Assembled communications and solar boxes.
- Installed communication and power box.
- Installed solar power box.
- Pulled cables up the tower to power/communicate with 6 devices.
- Install Mikrotik hAP ac2 for AREDN tunnel access.
- Installed UISP Switch for PoE control of devices.
- Installed Mikrotik hAP ax2 for backbone and extra non-poe ports.