Journal Entry

Object San Bruno Mtn 7
Created 2024-12-07 21:08
Created By admin
Kind Info

Tags

No tags assigned

Comments

June 2023

  • Based on Mike's feedback from the May visit, rerouted all our cables from the "downspout" entry into the shack to the "gland" entry point. Now all our cables go in the official way.
  • Rerouted the south cabling on the tower to follow and hide behind the tower beams (per Mike) to make the install much cleaner.
  • Move the NUC11 ethernet cable to the switch to allow experimenting using the NUC to manage the backbone traffic.
  • Installed the new rubber entry "thingy", rerouted cables through it, and trimmed and re-terminated.
  • Installed new Mikrotik Router CRS112-8P-4S-IN
  • Removed UISP Router and the rack shelf it was on.